Collaborated in preparing engineered designs. Completed removal of existing log crib bridge, disposal of and replacement of two damaged bridges at km36.9 and km37.4 on the Seymour FSR. Project consisted of transportation of existing bridge components to site, assist rehabilitation processes to restore structures to functional state, and installation.
Louisiana Pacific, Malakwa, BC
Approx. $190,000
North of Salmon Arm, BC on the Seymour FSR
Summer 2018