Provided topographic survey & road design for Upper Campbell Road access. Prepared two designs to navigate narrow and steep switch-back sections of the Upper Campbell Road system.
Both sites required culverts to maintain natural waterway passage. Using AutoTURN Vehicle Swept Path Analysis software, the road prism was determined and implemented.
Weyerhaeuser Canada, Penticton Division, BC.
Approx. $8,500
Penticton, British Columbia
Summer 2018